Customization: | Available |
---|---|
After-sales Service: | Technical Service with Free, Training The Workers |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
3PE Anti-Corrosion Coating Line for Steel Pipes
3PE (Three-Layer Polyethylene) anti-corrosion coating is a high-performance pipeline protection system that significantly extends the service life of steel pipes-from 5-10 years to as long as 50-100 years. This coating consists of:
First Layer: Fusion Bonded Epoxy (FBE) > 100μm
Second Layer: Adhesive (AD) 170-250μm
Third Layer: Polyethylene (PE) coating 2.5-3.7mm
The 3PE coating offers high mechanical strength, outstanding electrical insulation, process precision, and environmental safety.
This advanced anti-corrosion technique is widely adopted globally, particularly in the oil, gas, and water industries. It ensures effective protection of buried pipelines by preventing chemical corrosion and physical damage.
Typical usage includes:
Oil and gas transmission pipelines
Urban water and gas distribution networks
Industrial fluid transport systems
Upload Pipes → Pipe Conveyor → Rust Removal → Medium-Frequency Heating → Epoxy Powder Coating → Middle Layer & PE Stripe Winding → Water Cooling → Pipe Conveyor → Chamfering → Unload Pipes
Item | Process Flow |
1 | Upload pipes |
2 | pipes sprial conveyor |
3 | external blasting |
4 | internal blasting |
5 | Rust removal |
6 | intermediate frequency heating |
7 | FBE powder coating |
8 | Powder recycling system |
9 | load down pipe rack |
Pipe Diameter Range:
48-219mm, 219-1220mm, 800-1600mm, 1000-2400mm (Max: 4200mm)
Sand Blasting Grade:
SA 2.5
Coating Thickness:
80-800μm
Production Output:
3-8 km/day depending on pipe size
Annual processing capacity: 2 million m² (Φ508mm pipe)
Delivery Time:
2-3 months after deposit
Warranty:
12 months for mechanical parts
6 months for electrical components
Pre-Delivery Trial Operation:
All equipment undergoes trial runs to ensure performance before shipping.
Training & Support:
On-site training and technical guidance for operator teams.