PU Foam Pre-Insulated Pipe HDPE Casing Pipe Jacket Pipe Extrusion Line
Product Description
Pre-Insulated HDPE Plastic Jacket Pipe Production Line:
HDPE jacket pipe extrusion line is high-efficiency equipment with high speed and energy saving for producing HDPE pipe used as protective cover of PU foam thermal Pre-Insulated Pipe according to international standard.
HDPE jacket pipes are produced by vacuum calibration method, with smooth inner and outer walls, a long service life, good anti-corrosion and heat preservation performance, and excellent mechanical properties.
Product Parameters
Style |
PE-110/500 |
PE-655/1380 |
PE-960/1860 |
PE-1155/2200 |
Main Extruder |
SJ-75/33 |
SJ-120/33 |
SJ-150/33 |
SJ-150/33 |
Pipe diameter |
Φ110-600mm |
Φ655-1380mm |
Φ960-1860mm |
Φ1155-2200mm |
Capacity |
250-350kg/h |
700-900kg/h |
1000-1200kg/h |
1350kg/h |
Installed power |
160kw |
480kw |
580kw |
650kw |
Length |
26m |
36m |
45m |
45m |
Production line composition:
-1set Vacuum loader
-1set Hopper dryer
-1set High-efficiency single screw extruder
-1set Vacuum calibration table
-1set Water spraying tank
-1set Hauling machine
-1set Cutting machine
-1set Discharging Frame
-1set PLC
Detailed Photos
Our Advantages
Features of the HDPE sleeve production line:
1.small dimension
2.high degree of automation, can be operated by one person, saving labor costs
3.long service life.
4.high-efficiency extruder gives larger output, stable performance
5.pipe wall is average and smooth
6.no waste of raw material
7.One-time molding
The advantages of our company:
1.Provide a comprehensive and fully integrated production solution, including design, installation, commissioning, training.
2.Share you 389 sets of production experience from all the world
3.Having 9 professional senior engineers
4.Having a high-end plastic machinery equipment expert workstation in China
Factory overview

Our team

Delivery

Exhibition

Certifications

