3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process

Product Details
Customization: Available
After-sales Service: Installation and Training
Warranty: 12monthes
Manufacturer/Factory & Trading Company
Gold Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 6 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (28)
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
  • 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
Find Similar Products
  • Overview
  • Product Description
  • Application
  • Technological flow
  • Product Parameters
  • Company Profile
Overview

Basic Info.

Model NO.
HSD
Type
Coating Production Line
Coating
Powder Coating
Substrate
Steel
Certification
CE, ISO, RoHS
Condition
New
Output Speed
1-6m/Min
Delivery Time
40-60days
Temperature
0-30
Humidity
85% No Condensation
Material
HDPE/Hot Melt Adhesive/Fbe Powder
Transport Package
Wooden/Plastic Film
Specification
57-3000mm
Trademark
Huashida
Origin
Qingdao, China
HS Code
8479819000
Production Capacity
30units

Product Description

3LPE 2LPE pipe corrosion resitant pipe production line with rust removing process and FBE coating process

 
Product Description

3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
Application

3PE anti-corrosion coating is that the steel pipe is protected by three layers to prolong the life of service  from 5-10years to 50-100years.
First layer is Fusion bonded epoxy layer (FBE> 100µm), the second layer is adhesive (AD) 170 ~ 250µm, and the third layer is polyethylene (PE) stripe 2.5 ~ 3.7mm.
3PE steel coating pipe has the features of high mechanical strength, excellent electrical insulation performance, Process accuracy and environmental friendliness.



The three-layer HDPE stripe winding process, with epoxy powder coating as bottom layer and binding adhesive as second layer, is the widely used technique in steel pipe anti-corrosion all over the world.  The anti-corrosion steel pipe are applied in oil, gas and water supply pipelines.


Three-Layer structure of 3PE anti-corrosion pipe 
The three-layer PE anti-corrosion structure includes fusion bonded epoxy-powder bottom layer, polymer adhesive middle layer and polyethylene outside layer. The epoxy powder is a kind of thermosetting nontoxic coating, forming the high molecular weight cross-linking structure coating after solidifying, featuring good chemical anti-corrosion and high mechanical properties. Function of epoxy layer is to form continuous coating and to provide the steel tube surface with good  chemical resistance and cathodic disbanding resistance. The function of polymer adhesive is to agglutinate the epoxy layer and the polyethylene outside layer, which unites all three layers together. The polyethylene layer protects the pipe from abrasion, bump and water.


 
Technological flow

Upload pipes→pipes conveyor→rust removalintermediate frequency heating→Epoxy powder coating→Middle layer  &polyethylene stripe windingwater cooling→pipes conveyor→ pipe chamfer→unload pipes

3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process


Blasting machinery 
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process

steel pipe conveyor
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process

FBE Coating machinery 
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process

PE/PP  layer wrap extruder line 3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process

Product Parameters

Main Equipment of 3PE anti-corrosion coating processing
 
No. Name Set
A. Derusting Equipment                                          
1 Pipe-conveying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
 
Company Profile

1. Our History

Qingdao Huashida Machinery Co., Ltd was established in 2003. Since its
inception, Huashida has focused on plastic polyurethane insulation pipe
production line, 3PE anti-corrosion pipe production line, large diameter
underground pipe production line and plastic pipe joints for 20 years.
We always attach great importance to research and development,
collaborating closely with Tsinghua University, Beijing University of
chemical technology, South China university of technology and scientific
research institutions. by absorbing advanced technology home and
abroad, we now rank one of the top 3 manufacturers in the industry in
China.

3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process3lpe 2lpe Pipe Corrosion Resitant Pipe Production Line with Rust Removing Process and Fbe Coating Process
1. ISO 9001
2. ESTABLISHED OCCUPATIONAL HEALTH AND  SAFETY MANAGEMENT SYSTEM CERTIFICTE
3. ENVIRONMENTAL MANAGEMENT SYSTEM CERTIFICATE
4. BUSINESS LICENCE

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier