• 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
  • 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
  • 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
  • 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
  • 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
  • 3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line

After-sales Service: Overseas Installation, Free Technical Supporting
Warranty: 12 Months
Type: Coating Production Line
Coating: 3-Layer PE
Substrate: Steel
Certification: CE, ISO
Customization:
Gold Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
273-1400mm
Condition
New
Transport Package
Plastic Film and Wooden Pallet
Specification
273-1400mm
Trademark
HSD
Origin
Qingdao
HS Code
8477209000
Production Capacity
15sets/Year

Product Description

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line

Description
3PE Anticorrosion coating processing line is to make 3-layer anti-corrosion coating for kinds of steel pipes.
3 layer coatings, first FBE coating, middle is adhesive layer, outside polyethylene layer.

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


3PE can strengthen the pipeline's mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.
3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water and other fluids. They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system. 




.
Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line




Main Equipment of 3PE anticorrosion processing
Configuration List

No. Name Set
A. Derusting Equipment                                          
1 Pipe-converying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line




Question & Answer:
Q1. What is the range of pipe diameter the equipment can produce?
A: Diameter of steel Pipe: 48-219mm,219-1220mm,800-1600mm,1000-2400mm
Q2. What is the sand blasting grade?
A:SA2.5
Q3. What is your anti-corrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time?
A: 2-3 months after deposit.
Q5. Production output 
A: It has different output capabilities as different pipe diameters, the Max. is 3 to 8 km/day, and the annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness: 
A: 80~800um
Q7. To which country did you sell your 3PE equipment?
A. We have produced nearly 50 sets of 3PE processing lines at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q8. After-sales service: 
A:  Warranty period:
Before delivery, all the equipment must be trial-operated to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for the mechanical part and 6 months for the electrical part.
Service:
We provide technical services and provide training and guidance to buyer operators.

Our factory
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Our team
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Workshop

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Delivery
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Exhibition
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line



 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now