Customization: | Available |
---|---|
After-sales Service: | Overseas Installation, Free Technical Supporting |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The steel pipe is treated with external 3PE anti-corrosion (bottom layer epoxy powder + middle adhesive + outer layer polyethylene) and internal epoxy coating spraying, which combines strong adhesion, chemical corrosion resistance and mechanical protection performance. It is widely used in oil and gas transportation, water supply and drainage and other pipeline fields, effectively extending the service life.
The lines can be applied to FBE, 2 layer FBE, 2 layer PE, 2 layer PP and 3 layer PE anti-corrosion coating.
Steel pipe coverage range: 114mm-4200mm
Processing capacity: ≤250m2/h
Cleaning grade: Sa2.5 level
Coating Materials: Polyethylene, Adhesive, Epoxy
Heating Method: Induction Heating
Cooling Method: Water Cooling
Coating Type: Internal, External
No. | Name | Set |
A. Derusting Equipment | ||
1 | Pipe wheel conveyor | 1 |
2 | Internal External Shot Blasting Machine | 1 |
3 | Cyclone Dust Collector | 1 |
4 | Pulse dust collector | 1 |
5 | Centrifugal exhaust fan | 1 |
6 | Rust removal equipment PLC | 1 |
B. Coating equipment | ||
1 | Pipe wheel conveyor | 1 |
2 | Induction heating device | 1 |
3 | Powder spraying device | 1 |
4 | Automatic loading dryer | 2 |
5 | SJ-65/30 Extruder | 1 |
6 | SJ-120/30 Extruder | 1 |
7 | Hot melt adhesive extruder die | 1 |
8 | PE sheet extruder head mold | 1 |
9 | Hot melt adhesive/PE sheet coating device | 1 |
10 | Environmental Protection Ventilation equipment | 1 |
11 | Cooling Spray equipment | 1 |
C.Platform Equipment | ||
1 | Steel pipe uploading platform | 1 |
2 | Downloading platform | 1 |
3 | Pipe storage platform | 1 |
4 | Turnover machanism | 3 |
D.Groove Equipment | ||
1 | PE Beveling Machine | 2 |
2 | Hydraulic Lifting and Turning Machinery | 1 |
3 | Hydraulic Equipment | 1 |
4 | PLC automatic control system | 1 |
Delivery
Exhibition
Certifications