Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes

Product Details
Customization: Available
After-sales Service: All Life
Warranty: 6-12 Monthes
Manufacturer/Factory & Trading Company
Gold Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 6 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (28)
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
  • Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
  • Packaging & Shipping
  • Company Profile
  • Exhibition
Overview

Basic Info.

Type
Coating Production Line
Coating
Powder Coating
Substrate
Steel
Certification
ISO
Condition
New
Pipe Dia.
48-3000mm
Blasting
>2.5A
Transport Package
Standard Package
Specification
EN253, EN448, EN728, ISO1133, ISO8501-1
Trademark
HSD
Origin
Qingdao China
HS Code
8479819000
Production Capacity
10 Units/Year

Product Description

Product Description

The 3PE anti-corrosion coating production line is designed for applying a three-layer coating to steel pipes, enhancing their mechanical strength, electrical insulation, and durability. It is ideal for oil, gas, water, and other fluid transmission pipelines.

Coating Structure:
First Layer: Fusion-bonded epoxy powder (FBE > 100µm)
Second Layer: Adhesive (AD) 170 ~ 250µm
Third Layer: Polyethylene (PE) 2.5 ~ 3.7mm

Key Features:
·Enhances pipe lifespan from 5-10 years to 50-100 years
·High mechanical strength, excellent electrical insulation, waterproof, wear-resistant, and anti-aging properties
·Suitable for harsh environments and corrosive conditions

Equipment Composition
Rust Removal Equipment: Includes shot blast cleaning machine, dust collectors, and rust removal PLC control system.
Coating Equipment: Features powder spraying device, heating system, coating devices, cooling spray, and extruders.
Platform Equipment: Steel pipe platform, storage platform, hydraulic equipment.
Groove Equipment: Includes PE beveling machines and lifting machinery.
Compressed Air Equipment: Air compressors, precision filters, and gas tanks.

Technological Process
Pipe Input: Upload pipes
Conveying: Pipe screw conveyor
Rust Removal: Intermediate frequency heating
Coating: Epoxy powder coating, adhesive, and polyethylene
Cooling: Spray cooling system
Finishing: Grinding and unloading pipes
 
Product Parameters
Specifications
Pipe Diameter Range: Φ159 ~ Φ1220
Coating Thickness: 80 ~ 800µm
Production Output:
Max. 3-8 km/day
Annual processing capacity: 2 million square meters (Φ508mm)
Coating Standards: Meets SY/T0413-2002, GB/T23257-2009, German DIN 30670, American Corrosion Association, and other international standards.

Main Equipment of 3PE anticorrosion processing
Configuration List
No. Name Set
A. Derusting Equipment                                          
1 Pipe-converying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1
Detailed Photos
Three-Layer PE Coating Line Durable Anti-Corrosion Solution for PipesThree-Layer PE Coating Line Durable Anti-Corrosion Solution for PipesThree-Layer PE Coating Line Durable Anti-Corrosion Solution for PipesThree-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
FAQ
Frequently Asked Questions

What is the pipe diameter range the equipment can produce?

-48-219mm, 219-1220mm, 800-1600mm, 1000-2400mm

What is the sandblasting grade?

-SA2.5

What is the anti-corrosion coating standard?

-Meets multiple international standards, including SY/T0413-2002 and DIN 30670.

What is the delivery time?

-2-3 months after deposit.

What is the production output?

-Max. 3-8 km/day, annual capacity of 2 million square meters (Φ508mm).

What is the coating thickness?

-80 ~ 800µm.

Where has the 3PE equipment been sold?

-Countries including Russia, Iran, UAE, India, Belarus, Kazakhstan, etc.

What after-sales services are offered?

-Warranty: 12 months for mechanical parts, 6 months for electrical parts.
Support: Technical services, training, and guidance for operators.
Packaging & Shipping

Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
Company Profile

 

Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes
Exhibition

Three-Layer PE Coating Line Durable Anti-Corrosion Solution for Pipes



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier