Customization: | Available |
---|---|
After-sales Service: | All The Life |
Warranty: | 12monthes |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Anti-Corrosion in the form of 3PE is first layer epoxy, second is adhesive layer, the third is PE sleeve wrapping.
Process parameters of winding anticorrosion:
Production line size: 20 m X 15 m
Total water consumption: 30 cubic meters
Total power consumption: 450 kilowatts
Total gas consumption: 6 cubic meters / min.
Temperature condition: the temperature inside the workshop is higher than 5 degrees.
Winding anticorrosive steel pipe parameters
Diameter of steel pipe: 426, 630, 720, 820
Curvature radius: 4-6 times D
Elbow angle: 15-90 degrees.
Steel tube wall thickness: 8 mm -12 mm
Epoxy powder thickness: greater than 170 um
AD copolymer adhesive thickness: 170-250 um
PE layer thickness: 2.5 - 3.7 mm
If you want to know more you can contact with us. Diana\
Main Equipment List
No. | Name | Set |
A. Derusting Equipment | ||
1 | Pipe wheel conveyor | 1 |
2 | Shot Blasting Machine | 1 |
3 | Cyclone Dust Collector | 1 |
4 | Pulse dust collector | 1 |
5 | Centrifugal exhaust fan | 1 |
6 | Rust removal equipment PLC | 1 |
B. Coating equipment | ||
1 | Pipe wheel conveyor | 1 |
2 | Induction heating device | 1 |
3 | Powder spraying device | 1 |
4 | Automatic loading dryer | 2 |
5 | SJ-65/30 Extruder | 1 |
6 | SJ-120/30 Extruder | 1 |
7 | Hot melt adhesive extruder die | 1 |
8 | PE sheet extruder head mold | 1 |
9 | Hot melt adhesive/PE sheet coating device | 1 |
10 | Environmental Protection Ventilation equipment | 1 |
11 | Cooling Spray equipment | 1 |
C.Platform Equipment | ||
1 | Steel pipe uploading platform | 1 |
2 | Downloading platform | 1 |
3 | Pipe storage platform | 1 |
4 | Turnover machanism | 3 |
D.Groove Equipment | ||
1 | PE Beveling Machine | 2 |
2 | Hydraulic Lifting and Turning Machinery | 1 |
3 | Hydraulic Equipment | 1 |
4 | PLC automatic control system | 1 |